  • 450kWp EPC at EAC´s headquarters (Cyprus)

    Client

    • Electricity Authority of Cyprus (EAC)

    Scope of works

    • Removal of the existing Photovoltaic System and Study and Construction of a new 450kWp Photovoltaic System at the Head Offices of EAC
    • The project comprised:
    • PV system in building´s rooftop
    • PV system at building´s façade
    • PV system in building´s parking lot
    • Basic and Detailed Engineering of all systems and structures of the project
    • Removal of existing system in building´s façade
    • Engineering, Procurement and Construction (EPC) of the three systems
    • Full commissioning for EAC
    • System real-time monitoring using our proprietary software
    • The project was a successful Joint Venture with our local partner
  • 23MWp PV project re-engineering and construction (Uganda)

    Client

    • RIC Energy

    Scope of works

    • Complete re-engineering of the solar project
    • Saving over $1m in purchasing costs
    • Purchasing management of all components
    • Subcontractors hiring and management
    • 23MWp PV project construction management
    • Complete re-engineering and construction of 20MW substation
    • redesign of the layout and components to save time, money and land used
    • Lead negotiations with authorities
    • UETCL, utility
    • NEMA, environmental agency
    • Ministry of Energy
    • Project carried out in 7 months
  • 500MWp Project engineering and permitting (Spain)

    Client:

    • Copenhagen Infrastructure Partners (CIP)

    Scope of Works

    • Critical analysis of the project up to date
      • Evaluation of land used
      • Evaluation of permits
      • Evaluation of connection conditions
    • Since the project had been denied capacity...
      • We carried out a full evaluation of substation capacity in the surrpundings (up to 100km radius analysis)
      • Identified one node with available capacity
      • Succesfully identified:
        • Two differents ways to negotiate technical gridd connection at TSO Level
        • One option to get over 60% capacity at DSO Level (we identified suitable lines and land for the connection)
      • Engineering of the PV projects to be developed
      • Access Permits (technical and administrative documentation) application to the utility
  • Technical and business analysis report (Spain, 2020)

    Client

    • International energy fund

    Scope of works

    • Analysis of the current regulations and processes available for solar PV projects in Spain as of January 2020
    • Full description status of the transport level grid conditions in Spain
    • Country wise – overview model
    • Focus on area of interest for the client
    • Review of procedures for solar project permitting with Distribution Company in that area
    • Definition and analysis of implications of the Short Circuit Current (SCC) requirement reduction in Spanish grid and its effect on the capacity level of substations and grid connections for new renewable energy PV projects
    • Further analysis of the effect of future updates to SCC requirements in the aera of interest for the client
  • Hybrid photovoltaic and diesel generator isolated irrigation system in Portugal

    Constant pressure (5.7 bar) drip irrigation system

    Photovoltaic and 150 kVA diesel hybrid system

    • 200 hectares Super High Density (SHD) olive farming.
    • 3 pumps 45 kW/ea.
    • 2.500 m3/day pumping in summer days.
    • Total integration (no modifications to existing fertigation controller and interfaces) with Progrés A4000.

    Operating modes:

    • Photovoltaic (PV) only.
    • Diesel only.
    • Hybrid mode: PV + diesel.

    MARRUECOS

    MASLOWATEN
    Marruecos, Italia, Portugal y España
    1,20 MWp 

    CHILE

    12 PROYECTOS
    Más de 150 MWp

    ITALIA

    4 PROYECTOS
    Más de 85 MWp

    PORTUGAL

    2 PROYECTOS
    Más de 15 MWp

    ESPAÑA

    20 PROYECTOS
    Más de 130 MWp

    ISRAEL

    6 PROYECTOS
    Más de 80MWp

    ORIENTE MEDIO

    2 PROYECTOS
    28 MWp

    U.S.A.

    2 PROYECTOS
    Más de 25 MWp

    PERÚ

    1 PROYECTO
    Más de 18 MWp

    COLOMBIA

    1 PROYECTO
    0,02 MWp

    SUDÁFRICA

    1 PROYECTO
    Más de 94 MWp

    GUAPALOUPE

    8 PROYECTOS
    Más de 7MWp

    MARTINICA

    1 PROYECTO
    0,63 MWp

    BULGARIA

    6 PROYECTOS
    Más de 110 MWp

    REPÚBLICA DOMINICANA

    1 PROYECTO
    0,6 MWp

    UGANDA

    1 PROYECTO
    Más de 22 MWp

    KENIA

    1 PROYECTO
    0,50 MWp

    FRANCIA

    1 PROYECTO
    10 MWp

    ALEMANIA

    1 PROYECTO
    7,81 MWp

    NIGERIA

    1 PROYECTO
    50 MWp 

    GUINEA

    1 PROYECTO
    0,2 MWp

    ARGENTINA

    2 PROYECTOS
    11 MWp